critical-path-method 开源项目推荐(61 个)
critical-path-method 话题在 GitHub 上没有填写简介,这里按 Star 数汇总最相关的热门仓库。
热门项目 前 20
按 Star 数排序展示前 20 个 · GitHub 共 61 个仓库browser-based project scheduling tool built around dependency-driven scheduling
Algorithm for scheduling a set of project activities.
该项目在 GitHub 上没有填写描述
📊 Gantt + 🗂️ Kanban project management in Julia. One REPL command opens a local web UI in your browser — while the REPL stays free to drive the same projects in code. 🌐 Real-time sharing over your LAN.
Project scheduling engine for Rust
This project aims to implement Task Scheduling using the Critical Path Method (CPM). The Critical Path Method is a project management technique used to determine the longest sequence of dependent tasks and ensure efficient scheduling to complete a project as soon as possible.
TruePPM - open-core P3M. Mirror of gitlab.com/trueppm/trueppm
[ Riset Operasi ] Model PERT (Program evaluation and review technique) and CPM (Critical Path Method)
This repository contains a JavaScript algorithm designed to compare two graphs and identify the largest subgraph while calculating its critical path. Developed as a project for a course in my master's program, this project delves into discrete structures and graph theory, offering practical insights into graph analysis and optimization
Graduate course 11117BLG002 (SDÜ): R&D and Project Management in Computer Science. Research methods, TÜBİTAK, Horizon Europe and NSF proposal writing, scheduling, Monte Carlo risk, agile, earned value and technology transfer, with interactive labs, Colab simulations and knowledge checks. Open for reuse (CC BY 4.0, MIT).
Critical Path Method implemented with early, late start time
Implementations of various combinatorial optimization algorithms, focusing on approximation algorithms for NP-hard problems.
RiskPulse — AI-Driven Project Risk Manager A PMP-aligned web application for quantitative project risk analysis. RiskPulse utilizes Beta-PERT Monte Carlo simulations, Critical Path Method (CPM) scheduling, and Earned Value Management (EVM) to proactively identify bottlenecks, slippage, and resource contention in real-time.
The Critical Path Method, operationalized: baseline vs. current schedule, float erosion, and a composite schedule health score, computed automatically instead of eyeballed off a Gantt chart.
This repository contains my capstone project which is about Designing And Evaluating Critical Path Methods & Genetic Algorithms to Assess Critical Activities Within an Organization Using Process Mining in pm4py
The standalone cognitive shield for AI pair-programming: constructive adversarial dialectics (Method B+) to bust sycophancy with zero dependencies.
Algorithmic Critical Path Method (CPM) and Continuous Linear Programming (PuLP) schedule risk optimization engine with interactive Streamlit visualization and automated pytest verification.
Software Engineering course work: SDLC models, requirements engineering, user stories, black-box and white-box testing, project management and software architecture, with sprint reports and notes.
CPM schedule status, placed on a facility: one OpenUSD block per activity, colored good/warning/critical from the toolkit's own CPM engine. A synthetic practice model, not a real data hall.
关于这个话题
- 清单取自 GitHub 话题页并按 Star 数排序,每次展示前 20 个项目;原始页面见 https://github.com/topics/critical-path-method。
- 该话题在 GitHub 上共有 61 个仓库, 本站收录的是其中最热门的 20 个,不是全量列表。
- Star / Fork 每日自动刷新一次,实时数据以 GitHub 为准。
- 当前 20 个项目累计 742 Star,覆盖 6 种主要语言,数据更新于 2026-11-09。
- 中文介绍来自 GitHub 官方话题说明(github/explore)的机器翻译,可点「查看原文」对照;译文缺失时会先展示原文。